Who runs solar installer accreditation now?
Solar Accreditation Australia runs it. On 29 February 2024 the Clean Energy Regulator approved SAA as the accreditation scheme operator for installers and designers under the Small-scale Renewable Energy Scheme (SRES). Existing accreditations moved across during a three-month transition, and the Clean Energy Council has finished handing the program over. Any new accreditation or renewal now goes through SAA.
Some jobs still involve the Clean Energy Council. It keeps the approved lists of panels, inverters and batteries, and every product you install has to be on those lists. It also still runs CPD courses. SAA counts those points, with core courses worth 20 points and electives worth 10.
How accreditation links to STCs
Small-scale technology certificates (STCs) are what bring down the price of a household system, and the regulator ties them to the installer. You must be accredited and licensed to design or install a solar or battery system before anyone can claim STCs on it. You complete the work or supervise it, and you attend the site for job setup, the mid-install check and testing and commissioning.
You need geotagged, time-stamped photos of yourself at each of those three stages. The photo times must line up with the dates on your certificate of electrical compliance. Going back later to take photos is not allowed. If your evidence doesn't cover all three stages, the STC claim can be failed. The installer who does the testing and commissioning signs the written compliance statement, and penalties apply for false information.
What changes for batteries
Batteries became eligible for STCs on 1 July 2025 under the Cheaper Home Batteries Program, which runs through the SRES. Before you can claim STCs, the battery has to be installed by an SAA-accredited installer who holds a battery endorsement, and the work has to follow SAA's technical requirements. Supervision has to happen on site.
The battery itself must be on the Clean Energy Council's approved battery list. Its nominal capacity must fall between 5 and 100 kWh, and it must be able to join a virtual power plant. STCs are paid on the first 50 kWh of usable capacity only. If you install solar and a battery on the same job, you take a separate set of verification photos for each system. SAA also caps how many SRES installations one installer can commission in a day.
The training behind accreditation
The PV units come from the UEE Electrotechnology Training Package. UEERE0054 covers the site survey for grid-connected PV and battery storage systems. UEERE0080 covers installing PV power conversion equipment to the grid. UEERE0080 lists UEEEL0012 and UEERE0054 as prerequisites, and an unrestricted electrician's licence counts as meeting UEEEL0012.
For batteries, TAFEs and RTOs run short skill sets covering the units SAA asks for before it grants a battery storage designer and installer accreditation. Most electricians do this training after they are licensed. It's a set of short courses taken on top of a four-year trade.
Pay
AUD a year, before tax. Typical figures are based on ABS Employee Earnings and Hours, May 2025, moved to 2026 with a wage index; state figures are modelled. Award minimums are from the Electrical, Electronic and Communications Contracting Award 2020, effective 1 July 2026. Refer to the Renewables & Solar salary guide for figures from live adverts.
What you need
- Unrestricted electrical licenceYou need one in the state or territory where you install. Off-grid systems below 50 V AC and 120 V DC may be exempt, but state electrical safety rules still apply.
- SAA installer accreditationSolar Accreditation Australia must accredit you as an installer, a designer or both before STCs can be claimed on your jobs.
- Battery endorsementTo get STCs on a battery, the installer's SAA accreditation must carry a battery endorsement.
- PV training unitsThese include UEERE0054 for the site survey and UEERE0080 for installing PV power conversion equipment to the grid, from the UEE Electrotechnology Training Package.
- Approved productsPanels, inverters and batteries must be on the Clean Energy Council's approved lists when the system is installed and commissioned.
- On-site evidenceTake geotagged, time-stamped photos of yourself at setup, mid-install and commissioning that match the dates on your compliance certificate.
- CPDYou keep accreditation current through CPD. SAA recognises Clean Energy Council courses, with core courses worth 20 points and electives worth 10.
State by state
| Victoria | To install under Solar Victoria programs as an authorised solar PV or battery installer, you need an unrestricted (Class A) electrical licence registered with Energy Safe Victoria, plus the other conditions in the Solar Victoria Notice to Market. |
|---|---|
| New South Wales | Battery activities under the NSW Peak Demand Reduction Scheme (BESS1, BESS3 and BESS4) need an installer with an unrestricted electrician licence and current SAA Grid-Connected Battery Storage accreditation, either Design and Install or Install only. |
How to get there
- Years 1-4Electrical apprenticeshipDo a four-year electrical apprenticeship on the Electrical, Electronic and Communications Contracting Award. Pay goes up each year.
- End of year 4Unrestricted electrical licenceGet your full licence from your state regulator once your trade is done. SAA grid-connect accreditation depends on it.
- After licensingGrid-connect PV trainingFinish the renewable energy units, such as UEERE0054 and UEERE0080, with an RTO.
- After trainingApply to SAAApply to Solar Accreditation Australia with your ID, electrical licence number and evidence of training to get grid-connect install accreditation.
- Any time afterAdd battery endorsementDo a grid-connected battery storage skill set and apply to SAA for the battery endorsement, so your battery jobs qualify for STCs.
- OngoingKeep it currentEarn CPD points each accreditation period and keep up with SAA's install and supervision rules.
Open now on ElectricalRoles.com.au
Questions people ask
Is Clean Energy Council accreditation still valid for solar installers?
No. Since mid-2024, installers and designers have needed SAA accreditation numbers to claim STCs. A CEC number only covered installs completed before 29 May 2024, or up to the day the installer got a new SAA number.
Can an apprentice install solar for STCs?
Only under supervision. The accredited installer completes or supervises the work and must be on site for setup, mid-install and commissioning. Supervising battery installs also means being on site, under SAA rules.
Do I need separate accreditation for batteries?
Yes. To claim STCs on a battery, the installer needs SAA accreditation with a battery endorsement. Grid-connect PV accreditation alone does not cover batteries.
Do I need an electrical licence for off-grid solar?
Sometimes not. The regulator says an unrestricted licence might not be needed if the system isn't grid-connected and has no wiring at 50 V AC or 120 V DC and above. State electrical safety laws still apply, and most off-grid systems run above those voltages.
How many systems can one installer sign off in a day?
SAA caps SRES-eligible installations at 2 a day per installer: 2 solar PV systems, 2 batteries, or 1 of each. SAA's transitional arrangements ended on 31 August 2025, and every commissioning now counts toward the limit.
Sources
- Clean Energy Regulator: Rooftop solar installers and designers
- Clean Energy Regulator: Solar installers and designers
- Clean Energy Regulator: Solar battery installers and designers
- Clean Energy Regulator: Solar batteries
- Clean Energy Council: Accreditation handover to SAA
- training.gov.au: UEERE0080 Install photovoltaic power conversion equipment to grid
- Jobs and Skills WA: Grid-connected Battery Storage Systems Designer-Installer Skill Set
- Solar Victoria: Become an authorised solar retailer or installer
- IPART: Battery activities Q&A
- Fair Work Commission: Electrical, Electronic and Communications Contracting Award 2020